Black dance floor. Opening 14 meters, depth 12 meters, plus circulations.
Italian syle pendrillon.
Lumières
Set of organs with Memory settings 69 2kw circuits
- 37 P.C. 1000 w 10 en (716+#100), 9 en (241+# 100), 2 en (106+#114) 5 en 711 et 6 en (4X120 +027)
- 11 P.C. 2000 w (lentille Fresnel) 6 en 162, 5 en 106
- 3 P.C. 2000 w (1 en 162 + #114), (1 en 162 + #100), (1 en 108 + #119)
- 9 découpes 1000 w type 614 Juliat ou Équivalent 5 en (162+#132), 2 en (106+#114) et 2 en #119
- 10 découpes 1000 w type 613 SX Juliat ou Équivalent 6 en (711+#114) et 4 en #132
- 8 découpes 2000 w type 713 SX Juliat en #132
- 8 découpes 2000 w type 714 SX Juliat 2 en 711, 3 en 106
- 16 P.A.R. 64 CP 62 8 en
Vidéo
The electrical circuit for the video must be separate from the light.
- 1 videoprojector6500 lm (Lens in relation with the distance technical table/stage)
- 1 mixette vidéo V8 Edirol
- 2 cables BNC de 5 m
- 1 cable BNC de 50 m (régie à caméra cintres)
- 6 adaptateurs BNC/RCA males
Sound
The sound table must be inside the room.
- 1 CD player
- 1 digital table 6 groups (M7cl, LS9, DM 2000 ou Èquivalent)
- 2 speakers on stage (type 115 ou PS15)
- 1 front system adapted to the room;
- 2 speakers (type PS10 or112)in the room above the audience;
Diffusion is made by a computer and fireface 400.The sound get the digital table by a male 6 XLR (or by ADAT).
Set up
Day one
- 9:00 am - 12:00 pm (light and curtain setting) 2 stage hands, 2 electricians, 1 light manager./li>
- 2:00 pm - 6:00 pm (light focus) 1 stage hand, 2 electrician, 1 light manager, 1 sound manager, 1 video manager.
- 6:00 pm - 8:00 pm (dancers rehearsal on the stage) with or without technical managers depending on the advancement of set up.
Day two
- 9:00 am - 12:00 pm (light focus and light Cues recording) 1 stage hand, 2 electricians, 1 light manager, 1 dresser .
- 12:00 pm - 2:00 pm sound check 1 sound engineer.
- 2:00 pm - 4:00 pm (final rehearsals) 1 video manager, 1 light manager.
- 4:00 pm - 6:00 pm (dress rehearsal) 1 stage hand, 1 light manager, son, et video 1 dresser.
Performance
The performance takes 1hour 10 minutes
- one light manager
- 1 sound engineer
- 1 video manager.
Dismantling
Approximately 2 hours
Dressing rooms
Catering should be ordered one day before performance. Water at disposal.
Heated dressing rooms with showers and toilettes for 7 people. Towels.